Implementation of natural gas operations as per API and ANSE standards and regulatory requirements

These are just few samples of the projects which, successfully completed by Gazresanan Industrial Company during past 23 years:

  • In January 2008 Natural Gas project of PARCHEEN CHEMICAL INDUSTRIES was successfully completed in due time and included the following items:

  1. Design and Equipment supply of Natural Gas Network.

  2. Cathodic protection of Network.

  3. Fuel Conversion of heating burners of boilers.

  • In October 2006 the project of Transmission of Natural Gas to the North of SARCHESHME COPPER COMPLEX as well as present water feeding installations was successfully completed in due time.

  • In March 2005 the project of installation and commissioning of Transmission Line (size 10”) of natural gas was successfully completed in due time. KERMANSHAH, IRAN.
    In September 2004 the project of Construction & installation of Gas station (TBS, CGS), Cathodic protection of Network for feeder line and transmission line of FARAMAN Industrial Township was successfully completed in due time.

  • In November 2003 the project of Design and Equipment Supply and implementation of Natural gas Network of RESEARCH INSTITUTE OF PETROLEUM INDUSTRY was successfully completed in due time.

  • In January 1998 the greatest natural gas project of NATIONAL IRANIAN COPPER INDUSTRIES COMPANY was successfully completed in due time by Gazresanan Industrial Company. The project was included the following items:

  1. Construction and Installation of Gas Station with the capacity of 150000 m3/h.

  2. Installation & Implementation of Natural Gas Network.

  3. Installation and commissioning of Transmission Line.

  4. Cathodic protection of Network for feeder and transmission line.